The ElectricFish 400squared can be installed in as little as a few hours instead of months. That's because it doesn't need costly grid upgradesand the secret lies inside the box. America's EV charging infrastructure is growing nicely, but there's still more to do if charging anxiety is to become a thing of the past. The U.S. has over 14,000 DC fast charging stations with more than 67,000 individual ports, but one startup reckons it can speed up installations by eliminating one of the main bottlenecks:
Batteries in electric vehicles that regularly use 100-plus-kilowatts fast chargers degrade faster than those that rely primarily on slow charging, a new study suggests. Using fast chargers more frequently can cause some packs to lose nearly a quarter of their capacity in eight years, it claims. We've seen other studies suggest that fast charging has little impact on long-term battery health, so it's not a settled debate.
While the abrupt end to your home chef experience is inconvenient, the bigger issue is that your gas furnace still needs electricity to run, and it's supposed to drop into the 20s overnight. Now imagine that while everyone else is rifling through their junk drawer for flashlights and batteries,
Last year, the company's profit fell 45% compared with 2024, driven in large part by falling sales of its electric vehicles. Investors anticipated the decline in sales, but Tesla still beat Wall Street earnings and revenue estimates thanks to its energy storage business. Tesla deployed a record 46.7 gigawatt-hours of energy storage products in 2025, a 48% increase from last year, according to the company's official filings.
The group points out, correctly, that the grid is designed for brief bursts of high demand; most of the time there's lots of capacity that goes unused. Utilize thinks that should change. The group argues that smarter ways to use that capacity already exist. Utilize name checks a number of those solutions, including battery storage, demand response, and virtual power plants, all of which have emerged en masse over the last decade, but remain under utilized.
The first sites are expected to open later this Summer, and will be built at select locations along I-5 and I-10, major routes for commercial vehicles and significant logistics companies. The chargers will be available in California, Georgia, Nevada, New Mexico, and Texas. Each station will have between four and eight chargers, delivering up to 1.2 megawatts of power at each stall.